Final 2015 Santa Clarita Valley Joint Sewerage System Facilities Plan and EIR

Notice: All documents are in Adobe Portable Document Format (PDF), which requires Adobe Acrobat Reader to view. If you are unable to view these files online please right-click on the links and choose Save Target As to save these files to your hard drive, then open them locally.

Table of Contents
List of Tables
List of Figures

Executive Summary

PART I:  2015 SANTA CLARITA VALLEY JOINT SEWERAGE SYSTEM FACILITIES PLAN

Chapter 1 - Introduction
Chapter 2 - Existing and Projected Planning Area Characteristics
Chapter 3 - Wastewater Treatment Requirements
Chapter 4 - Description of Existing Facilities
Chapter 5 - Existing and Projected Water and Wastewater Characteristics
Chapter 6 - Analysis of Project Alternatives
Chapter 7 - Summary of the Recommended Project

PART II:  2015 SANTA CLARITA VALLEY JOINT SEWERAGE SYSTEM FACILITIES PLAN ENVIRONMENTAL IMPACT REPORT

Chapter 8 - Introduction
Chapter 9 - Land Use
Chapter 10 - Geologic Hazards and Soils
Chapter 11 - Energy and Chemicals
Chapter 12 - Transportation
Chapter 13 - Air Quality
Chapter 14 - Noise
Chapter 15 - Aesthetics
Chapter 16 - Hydrology
Chapter 17 - Water Quality
Chapter 18 - Biological Resources
Chapter 19 - Public Health
Chapter 20 - Public Services and Facilities
Chapter 21 - Cultural Resources
Chapter 22 - Population, Employment, and Housing
Chapter 23 - Cumulative, Growth-Inducing, and Growth-Related Impacts
Chapter 24 - Draft Mitigation Monitoring Program

PART III:  2015 SANTA CLARITA VALLEY JOINT SEWERAGE SYSTEM PUBLIC PARTICIPATION PROGRAM

Chapter 25 - Public Participation Program
Chapter 26 - Response to Comments

APPENDICES
Appendix A - State Water Resources Control Board Requirements for Project Reports
Appendix B - Transportation
Appendix C - Air Quality 
Appendix D - Hydrological Analysis
Appendix E - Species of the Santa Clara River System
Appendix F - NOP Distribution and Response Lists
Appendix G - Agency Scoping Meeting Mailing List
Appendix H - Public Workshop Mailing List
Appendix I - Agency Scoping Meeting Attendees
Appendix J - Public Workshop Attendees
Appendix K - Public Workshop Advertisement
Appendix L - Distribution List for the Draft 2015 Plan and EIR
Appendix M - Public Hearing Attendees
Appendix N - Distribution List for the Final 2015 Plan and EIR

LIST OF FIGURES
Figure ES-1
Figure ES-2
Figure 1-1

Changes and Errata
List of Major Contributors
Bibliography
List of Abbreviations