Listing of Advertised Projects

LAST UPDATED: APRIL 11, 2019

ATTENTION PROSPECTIVE BIDDERS: The Bid Documents may be obtained by contacting the Sanitation District's Public Counter at (562) 908-4288, extension 1205. The Sanitation District does not warrant the accuracy or completeness of Bid Documents obtained from any source other than the Sanitation District's Public Counter, and any use of such documents by prospective bidders or others for any purpose is solely at the bidders' risk.

For technical questions concerning the plans and specifications and/or further information regarding the status of a particular project, contact the Project Manager at the extension number provided at (562) 908-4288.

PROJECT NAME /
DOLLAR RANGE

ADVERTISE

WALK-
 THROUGH 

BID

AWARD

WORKING
DAYS

Landfill Gas Wells and Header Line Repair at Various District Landfills-2019 (Robinson, Charles, Ext.: 2487 — approx. $1,600,000 — $2,400,000)

Plan Holder List

Apparent Low Bidder - MMC, Inc. ($2,281,700.00)

Bid Item Sheet

Bid Results

03/14/19

Mandatory
03/26/19
10:00 AM

04/11/19

05/22/19

760

Joint Outfall "C" Unit 4B Trunk Sewer Rehabilitation (Hsu, Jenny, Ext.: 1618 — approx. $2,500,000 — $3,700,000)

Plan Holder List

Bid Item Sheet

03/28/19

Mandatory
04/10/19
10:00 AM

04/30/19

05/22/19

210


LANDFILL GAS WELLS AND HEADER LINE REPAIR AT VARIOUS DISTRICT LANDFILLS-2019(Mandatory walk-through location: Puente Hills Landfill, 2800 South Workman Mill Road, Whittier, CA 90601) — The project is located at various District Landfills, located: Calabasas, Agoura, Palos Verdes, Rolling Hills Estates, Puente Hills, Scholl Canyon, and Spadra Landfill. The work consists of furnishing all materials, equipment and tools, the performance of all necessary labor, and the construction complete, including all work appurtenant thereto, for the construction of the above-named project. The work includes, but is not necessarily limited to, the following installation of: 1) 30-inch diameter auger driven refuse wells drilled by an experienced driller; 2) 24-inch diameter auger driven soils wells drilled by an experienced driller; installation of associated piping; and all appurtenant work; 3) realignment, replacement and installation of header line piping; 4) replacement and repair of gaskets; 5) replacement and repair of couplings; 6) replacement and repair of expansion joints and all other appurtenant work; 7) installation of poly vinyl chloride (PVC) and high density poly ethylene (HDPE) landfill gas header pipe line.
JOINT OUTFALL "C" UNIT 4B TRUNK SEWER REHABILITATION(Mandatory walk-through location: Fountains Condo Complex, 4900 E. Artherton St., Long Beach, CA 90815) — The work consists of rehabilitation of approximately 2,760 feet of 48-inch diameter RCP on the Joint Outfall “C” Unit 4B Trunk Sewer with cured-in-place pipe (CIPP) liners and by sliplining with Fiberglass Reinforced Polymer (FRP) liner pipe, and rehabilitate eight (8) manholes on the Joint Outfall “C” Unit 4B Trunk Sewer with calcium aluminate cement coating and thirteen (13) manholes on the Marina Trunk Sewer Section 1A (Marina 1A) with a cured-in-place fiberglass lining system or epoxy mastic and flexible PVC liner system, and all appurtenant work. The project will also construct approximately 170 feet of 15- and 24-inch diameter VCP airlines on the Long Beach Water Reclamation Plant Interceptor Section 1.