Listing of Advertised Projects

LAST UPDATED: OCTOBER 17, 2019

ATTENTION PROSPECTIVE BIDDERS: The Bid Documents may be obtained by contacting the Sanitation District's Public Counter at (562) 908-4288, extension 1205. The Sanitation District does not warrant the accuracy or completeness of Bid Documents obtained from any source other than the Sanitation District's Public Counter, and any use of such documents by prospective bidders or others for any purpose is solely at the bidders' risk.

For technical questions concerning the plans and specifications and/or further information regarding the status of a particular project, contact the Project Manager at the extension number provided at (562) 908-4288.

PROJECT NAME /
DOLLAR RANGE

ADVERTISE

WALK-
 THROUGH 

BID

AWARD

WORKING
DAYS

Gardena Pump Trunk Sewer Rehabilitation (Hsu, Jenny, Ext.: 1618 — approx. $3,100,000 — $4,600,000)

Plan Holder List

Bid Item Sheet

09/26/19

N/A

10/29/19

11/20/19

200

North Norwalk Trunk Sewer Rehabilitation Between MH 18 0381 and MH 18 0379 (Palencia, Perry, Ext.: 6806 — approx. $161,000 — $269,000)

Plan Holder List

Bid Item Sheet

10/03/19

N/A

10/31/19

11/27/19

65

San Jose Creek Water Reclamation Plant Interceptor Sewer Rehabilitation Phase 2 (Morales, Oscar, Ext.: 1630 — approx. $5,500,000 — $7,500,000)

Plan Holder List

Bid Item Sheet

10/10/19

Mandatory
10/29/19
10:00 AM

11/19/19

12/11/19

200


GARDENA PUMP TRUNK SEWER REHABILITATION — The work consists of rehabilitation of approximately 12,500 feet of existing 10-, 15-, 18-, 21- and 24-inch diameter non-reinforced concrete pipe (NRCP) and reinforced concrete pipe (RCP) on the Gardena Pump Trunk Sewer with cured-in-place (CIPP) liners. The project will also rehabilitate fifty-eight (58) manholes using a calcium aluminate cement (CAC) protective coating system, and all appurtenant work. The project begins at the intersection of Artesia Boulevard and Van Ness Avenue in the City of Torrance, then easterly along Artesia Boulevard, then northerly along Normandie Boulevard, then easterly along Redondo Beach Boulevard, then northerly along Raymond Avenue where the project ends at the intersection of Raymond Avenue and Marine Avenue in the City of Gardena.
NORTH NORWALK TRUNK SEWER REHABILITATION BETWEEN MH 18 0381 AND MH 18 0379 — The work consists of cured-in-place pipe (CIPP) lining approximately 650 feet of 15-inch vitrified clay pipe between MH 18 0381 and MH 18 0379 and calcium aluminate cement (CAC) coating of the three manholes along the rehabilitated reaches of the North Norwalk Trunk Sewer, and all appurtenant work. The project is located in the City of Norwalk on Norwalk Boulevard between Allard Street and Crewe Street.
SAN JOSE CREEK WATER RECLAMATION PLANT INTERCEPTOR SEWER REHABILITATION PHASE 2(Mandatory walk-through location: Joint Administration Office, 1955 Workman Mill Rd., Whittier, CA 90601) — The work consists of rehabilitating approximately 4,166 feet of 30-inch to 63-inch corroded concrete pipe and appurtenant structures. The sewer lining comprises four (4) segment located within the City of El Monte and unincorporated Los Angeles County. The segments are located along the existing sewer alignment beginning within the San Jose Creek WRP West property and ending at the intersection of Bessie Avenue and Shirley Avenue. The project also includes the concrete encasement of siphon upleg and downleg adjacent to the San Gabriel River.