Listing of Advertised Projects

LAST UPDATED: JUNE 18, 2019

ATTENTION PROSPECTIVE BIDDERS: The Bid Documents may be obtained by contacting the Sanitation District's Public Counter at (562) 908-4288, extension 1205. The Sanitation District does not warrant the accuracy or completeness of Bid Documents obtained from any source other than the Sanitation District's Public Counter, and any use of such documents by prospective bidders or others for any purpose is solely at the bidders' risk.

For technical questions concerning the plans and specifications and/or further information regarding the status of a particular project, contact the Project Manager at the extension number provided at (562) 908-4288.

PROJECT NAME /
DOLLAR RANGE

ADVERTISE

WALK-
 THROUGH 

BID

AWARD

WORKING
DAYS

Joint Outfall "F" Unit 3 Trunk Sewer Rehabilitation Phase 1 (Morales, Oscar, Ext.: 1630 — approx. $5,000,000 — $6,000,000)

Plan Holder List

Apparent Low Bidder - Spiniello Infrastructure West, Inc. ($6,327,630.00)

Bid Item Sheet

Bid Results

05/09/19

N/A

06/11/19

06/26/19

200

Joint Water Pollution Control Plant Biogas Pipeline At Figueroa Street (Nikonova, Tamara, Ext.: 2152 — approx. $1,800,000 — $2,800,000)

Plan Holder List

Bid Item Sheet

05/23/19

Mandatory
06/04/19
10:00 AM

07/02/19

07/24/19

200

Puente Hills Landfill Gas-to-Energy Facility Emergency Generator (Torres, Jelmer, Ext.: 2207 — approx. $400,000 — $700,000)

Plan Holder List

Bid Item Sheet

06/13/19

Mandatory
07/01/19
10:00 AM

07/18/19

08/14/19

180


JOINT OUTFALL "F" UNIT 3 TRUNK SEWER REHABILITATION PHASE 1 — The work consists of rehabilitation of various reaches of the Joint Outfall “F” Unit 3 Trunk Sewer, a siphon on the Joint Outfall “F” Unit 4 Relief Trunk Sewer, and a reach of the Joint Outfall “F” Unit 7A Trunk Sewer with cured-in-place pipe (CIPP) liner, and fiberglass reinforced pipe (FRP). Approximately 143 linear feet of 81-inch diameter reinforced concrete pipe (RCP) will be sliplined with FRP and approximately 212 linear feet of 45-inch diameter RCP siphon will be rehabilitated with CIPP liner. Approximately 1,428 feet of 66-inch and 2,025 linear feet of 63-inch RCP will be rehabilitated with CIPP liner beginning in the parking lot of 16449 Piuma Avenue, then easterly under the 605 Freeway and along 166th Street, and ending approximately 600 feet west of Gridley Road, within the City of Cerritos. Approximately 371 linear feet of 51-inch RCP will be rehabilitated with CIPP liner beginning at the intersection of Gridley Road and Alondra Boulevard, then westerly for approximately 371 feet, within the City of Norwalk and all appurtenant work.
JOINT WATER POLLUTION CONTROL PLANT BIOGAS PIPELINE AT FIGUEROA STREET(Mandatory walk-through location: Joint Water Pollution Control Plant, 24501 S. Figueroa Street, Carson, CA 90745) — The work consists of furnishing all materials, equipment and labor, for installation of approximately 1,130 feet of 18-inch and 1,140 feet of 12-inch diameter HDPE pipe and fittings, construction of condensate trap, and procurement and installation of pumping equipment, and all appurtenant work.
PUENTE HILLS LANDFILL GAS-TO-ENERGY FACILITY EMERGENCY GENERATOR(Mandatory walk-through location: 13130 Crossroads Parkway South, City of Industry, CA 91746) — The work consists of installation of District-furnished 1000-kW 4.16-kV emergency generator on a new concrete foundation with fuel containment, installation of an underground duct bank and modification of an existing switchboard to connect the generator, and all appurtenant work.