ATTENTION PROSPECTIVE BIDDERS: The Bid Documents may be obtained by contacting the Sanitation District's Public Counter at (562) 908-4288, extension 1205. The Sanitation District does not warrant the accuracy or completeness of Bid Documents obtained from any source other than the Sanitation District's Public Counter, and any use of such documents by prospective bidders or others for any purpose is solely at the bidders' risk.

For technical questions concerning the plans and specifications and/or further information regarding the status of a particular project, contact the Project Manager at the extension number provided at (562) 908-4288.

PROJECT NAME /
DOLLAR RANGE

ADVERTISE

WALK-
 THROUGH 

BID

AWARD

WORKING
DAYS

San Jose Creek Water Reclamation Plant Power Distribution System Modifications (ALAN PATON, Ext.: 2033 — approx. $12,500,000 — $15,300,000)

Plan Holder List

Apparent Low Bidder - Southern Contracting Company ($17,005,000.00)

Bid Item Sheet

Bid Results

06/22/17

Mandatory
07/11/17
10:00 AM

08/24/17

10/11/17

600

Monterey Park Relief Trunk Sewer Rehabilitation (ANTHONY HOWARD, Ext.: 1603 — approx. $315,000 — $525,000)

Plan Holder List

Apparent Low Bidder - Insituform Technologies, LLC ($491,284.00)

Bid Item Sheet

Bid Results

07/27/17

N/A

08/31/17

09/27/17

120

Pomona Water Reclamation Plant Pavement and Fencing Repairs-2017 (Kevin Kim, Ext.: 2179 — approx. $393,000 — $656,000)

Plan Holder List

Bid Item Sheet

08/10/17

Mandatory
08/29/17
10:00 AM

09/21/17

10/11/17

120


SAN JOSE CREEK WATER RECLAMATION PLANT POWER DISTRIBUTION SYSTEM MODIFICATIONS(Mandatory walk-through location: San Jose Creek Water Reclamation Plant, 1965 South Workman Mill Road, Whittier, CA 90601) — The proposed project will modify the existing plant power distribution system to provide redundant power sources to all critical switchboards and provide an additional 2500-kW emergency generator in the west plant. The project will include replacement of existing medium-voltage cables, transformers, low-voltage switchboards, and associated equipment that are obsolete and prone to failure, and all appurtenant work.
MONTEREY PARK RELIEF TRUNK SEWER REHABILITATION — The project begins in S. Woods Avenue approximately 150 feet north of Whittier Boulevard, then easterly in the alley north of Whittier Boulevard to the alley east of S. Woods Avenue, then northerly in the alley to Beverly Boulevard, all within unincorporated Los Angeles County. The work consists of lining approximately 3,865 linear feet of existing 8- and 15 inch diameter non-reinforced concrete pipe (NRCP) on the Monterey Park Relief Trunk and Monterey Park Extension Trunk Sewers with cured-in-place pipe liners and all appurtenant work. Appurtenant structures will be rehabilitated with calcium aluminate cement.
POMONA WATER RECLAMATION PLANT PAVEMENT AND FENCING REPAIRS-2017(Mandatory walk-through location: Pomona Water Reclamation Plant, 295 Humane Way, Pomona, CA 91766) — The work consists of existing asphalt concrete pavement replacement, new asphalt concrete pavement construction, concrete curbs and gutters, an electrical duct bank encased in concrete, a new concrete trench drain at the Liquid Waste Disposal Station, replacement of the entrance road chain link fence and gates with a higher security fencing system, replacement of a gate operator, and all appurtenant work.